Main page content

Entity view (Content)

Museum of Modern Art

United States of America
Stravibase Fix
Stravifloor Mount
The Museum of Modern Art
MoMA
Turner Construction
Diller Scofidio + Renfro & Gensler
Cerami & Associates
Severud Associates
Iwan Baan

Entity view (Content)

The grand dame of contemporary art museums, the Museum of Modern Art in New York, is getting a $400 million facelift.

MoMA’s extensive building and renovation project includes the construction of a new space, dubbed the Studio facing 53rd Street. The new space will feature live programming and performances, film and VR/AR demonstrations. The Studio at MoMA is a result of the new partnership with the Studio Museum in Harlem.

Close collaboration with the acoustical consulting firm Cerami & Associates and Gensler architects allowed CDM Stravitec to provide this unique isolation design. It includes custom isolators (Stravibase Fix) for a 45’ tall glass curtain wall offering stunning views of the city, a Stravifloor Mount floating floor system with cubical natural rubber isolators, and custom isolators for ceiling and ceiling-mounted equipment.