Stravifloor Jackup-E

Entity view (Content)

Benefits

  • Specifiers

    For Specifiers

    Guaranteed Acoustical Performance
    • Ensure that the floating floor is decoupled from the substrate
    • Natural rubber bearings provide a low, stable natural frequency over a wide load range, combining high dynamic stiffness with minimal deflection and low creep for long‑term performance
    • Jack-up floor with minimal openings in the floating slab
    • Possible to integrate insulation into the void to take care of standing waves within the void
    Design Flexibility & Adaptability to Architectural Constraints
    • Adaptable build-up height even after installation
    • Total build-up height is not dependent on the thickness of the bearing, allowing for high performance and low-profile floating floor systems
    Proven Performance (& Sustainability)
    • Acoustic laboratory test data available
    Easy to Specify
    • Easily integrate into project documentation and workflows with ready-to-use .dwg cross-sections, and BIM objects available online
    • Listed in external prediction tools, e.g., INSUL 
  • Installers

    For Contractors

    Reduced Installation Time and Labour Costs*
    • No formwork needed, limited number of components to be installed
    • Fast installation process
    • Comprehensive installation manuals and shop drawings

      *Installation services available by CDM Stravitec team, or at least installation supervision

    Simplified Logistics and Site Handling (and Reduced Waste or/and Reduced Error Chance)
    • Lower consumption of concrete than the majority of jack-up solutions available in the market, due to reduced minimum slab thickness (from 85 mm)
    • Colour coded metal plates within the bearings
    • Low number of components, reducing transport costs, simplifying on-site logistics, and minimising parts
    Flexibility in Construction Sequencing and Site Use
    • Control over jacking-up timing, allowing late-stage changes and better alignment with construction sequencing
    • Can take high loads before the slab is raised (e.g. used as a storage area during construction)